The need
A facility in West Kalimantan needed a 1,200 kVA generator fully installed in its generator room, including safe exhaust routing.
What we did
We designed and installed the exhaust line with silencer, set the unit on its foundation, then connected the panel and power cables.
The result
The generator was run and load tested before handover, and the room stays smoke-free because the exhaust is routed outside the building.